A pre-operational inspection is a walk through the plant after cleaning and before the first product of the day, looking at every surface food will touch and deciding whether it's clean. It works best when somebody other than the person who cleaned does it, with a flashlight, with the equipment still apart where it comes apart. Anything that fails is cleaned again and looked at again, and only then does the day start. For federally inspected meat and poultry plants this is written into the rules: procedures conducted before operations are part of the plant's Sanitation SOPs, they "shall address, at a minimum, the cleaning of food contact surfaces of facilities, equipment, and utensils", and they're done "before the start of operations". Below is a checklist for a made-up small meat plant, what each line means, the rule, and the file. Any food plant can use the same method.
The short version
- Inspect after cleaning and before production, every production day.
- Look at food contact surfaces first: blades, augers, tables, tubs, knives.
- Take apart what comes apart. Residue hides behind guards and seals.
- A NO stops that machine: clean it again, look again, write both down.
- Initial and date the record the same day.
- Meat and poultry plants: the SOPs are signed, records are kept at least 6 months.
- TaroStack puts your own checklist on each batch record. More below.
What the meat rules say
For an official establishment, the plant inspected by USDA's Food Safety and Inspection Service:
| Part | What 9 CFR 416 says |
|---|---|
| What the SOPs cover | All procedures the plant will conduct daily, before and during operations, sufficient to prevent direct contamination or adulteration of product |
| Pre-op, by name | Procedures conducted prior to operations are identified as such, and address, at a minimum, the cleaning of food contact surfaces of facilities, equipment and utensils |
| Who and how often | The SOPs give the frequency of each procedure and name the employee or employees responsible |
| Signed | By the person with overall authority on site, or someone above them, when first put in place and after any change |
| Done | Pre-operational procedures before the start of operations. Implementation monitored daily |
| Records | Daily records of implementation, monitoring and any corrective actions, initialed and dated by the responsible employee |
| Kept | At least 6 months. On site for 48 hours after they're completed, then off site if they can be produced within 24 hours |
So for a meat plant the checklist below isn't the SOP. It's the daily record that shows the pre-op part of the SOP was done and looked at. A plant under FDA or a State program works to different rules: the method is the same, and what your own rules ask for is a question for your regulator. A written procedure to hang the checklist on is in sanitation SOP template.
The checklist
For a made-up plant that grinds, cuts, slices and stuffs.
| Area | What to look at | Clean and ready means |
|---|---|---|
| Grinder | Auger, plate, knife, throat, pan, taken apart | No meat, fat or film on any surface that touches product. No water standing in the housing |
| Band saw | Blade, wheels, guides, table, scrap pan | No bone dust or fat behind the wheels or in the guides |
| Slicer | Blade, guard, carriage, ring guard, underside | Guard removed and cleaned behind. No residue at the blade's edge |
| Tables and cutting boards | Tops, edges, undersides | No residue under the lip. Boards free of deep scores that hold it |
| Knives, hooks, lugs, tubs | Each one, handles included | Clean, dry, stored off the floor |
| Stuffer and mixer | Cylinder, piston, horns, paddles, seals | Seals removed and cleaned. No residue in the horn |
| Packaging machine | Sealing bars, platen, film path | No product or film scraps |
| Sinks and hand wash | Hot water, soap, towels, sanitizer | Stocked and working. Sanitizer at the strength on its label, tested |
| Overheads | Rails, pipes, light covers, ceiling over product | No condensation dripping. No flaking paint or rust above product |
| Floors and drains | Under equipment, drain covers | No standing water or product |
| Coolers | Temperature, floor, shelves, door seals | At the temperature your plan sets. Nothing on the floor |
| People | Clean outer clothing, hair covered, hands washed | Before anyone touches equipment |
Each line gets OK or NO, and a NO gets two more entries: what was done, and who rechecked it and when.
How to do it
Look, touch, smell. Clean equipment looks clean under a flashlight held at a low angle, feels clean to a gloved finger, and smells of nothing. A greasy feel is fat. A rough feel is dried protein or mineral scale.
Go where the cleaner didn't want to. Behind the slicer's guard. Inside the stuffer's horn. The underside of the table lip. The back of the saw's upper wheel. If a part comes off without tools, take it off.
Food contact first. The rule's minimum is food contact surfaces, and they're where yesterday's product becomes today's contamination. Overheads matter next, because what drips, falls.
A NO is ordinary. A checklist with no NO on it for three months is worth a second look. What matters is the next two columns: "Grinder throat: fat film. Recleaned and sanitized, rechecked 5:50, TK."
Start after the last recheck. Write the time the inspection finished and the time production started. The second should be later than the first.
Look at the pattern. The same NO on the same machine three days running isn't a cleaning miss. It's a machine that's hard to clean, or a step missing from the procedure. Fix the procedure.
Where allergens change between products, pre-op is also when the changeover clean is checked: see allergen cleaning validation. The record of the cleaning itself is in cleaning log template, and the plan the whole thing sits under in prerequisite programs for HACCP.
This is general information, not legal advice.
Get the checklist
Download the pre-operational inspection checklist. One sheet and a read-me: the areas above, what to look at, what clean means, and columns for OK, what was done about a NO, and who rechecked it. Change the rows to match your own equipment. It's an ordinary Excel file with no macros, and it works in Google Sheets, LibreOffice and Numbers.
Where this stops working
A clipboard of pre-op sheets shows that someone looked. It doesn't connect to anything. When a customer complains about a package of sausage, the question is which day it was made, whether pre-op found anything on the stuffer that morning, and what else was made that day. The sheet is in one binder, the batch sheet in another, and the shipping record in a third.
How TaroStack does it
TaroStack keeps the day's batches, and your checks go on them.
Your own checklist fields on the batch record: tick boxes, numbers, text, initials. "Pre-op done and OK" can be one of them, with the initials of whoever did it.
Each batch notes the lots it used, automatically, and the lot it makes carries your code and date.
A printable batch-record form with the checklist and a sign-off.
One report from a package back to its day: the batch, the lots that went in, and the customers who got it.
| The question | Binders | In TaroStack |
|---|---|---|
| Which batch is this package | Read the code, find the sheet | The lot |
| Was pre-op signed that day | The pre-op binder | A field on the batch |
| What else was made that day | The production log | The day's batches |
| Who got it | Shipping records | The lot's report |
TaroStack doesn't write your Sanitation SOPs and isn't the record your inspector asks for unless you make it so. Recipes, batches and lots are on every plan, from $9.99 a month (5 recipes) or $39 a month (50 recipes). The first 14 days are free, with no credit card. If you'd like a hand setting up, ask, and we'll do it with you.