There's no standard rush fee. Shops that make to order set very different ones, and the right number for you comes from two sums. The first is a rate that rises as the time shrinks: nothing when the customer gives you your usual lead time, more as they give you less. The second is your own extra cost for that order: the overtime, the overnight shipping on materials, the other job that gets pushed. Charge whichever is more. The rate keeps the fee simple to quote. The cost check stops you quoting 15% on a job that costs you 25% to hurry. And some rush orders should be turned down, at any fee. Below is one shop's rates, four orders worked through, and a calculator.
The short version
- Start from your usual lead time. A rush is anything shorter.
- Set a rate for each step: this shop uses 15%, 30% and 50%.
- Add up what the rush costs you: overtime premium, rush shipping, extra materials.
- Charge the larger of the two.
- Put the fee on the quote as its own line, before you start.
- Say no when the rush would make another customer's order late.
- TaroStack says whether the materials are on hand before you promise a date. More below.
A rate by how short the time is
The example shop makes embroidered and engraved goods, and bakes on the side. Its usual lead time for most orders is ten working days. Its rates, which are its own:
| Time the customer gives you | Rush rate |
|---|---|
| Your usual lead time or more | None |
| Half of it or more | 15% |
| A quarter of it or more | 30% |
| Less than a quarter | 50%, or no |
The steps are steep on purpose. A fee that small customers shrug off doesn't change anyone's behavior, and the point of a rush fee is partly to pay you and partly to make people order on time.
Your own extra cost
A rush costs real money in three places.
Overtime. Count the premium, not the whole hour: if an ordinary hour costs you $20 and an evening hour costs $30, the rush added $10 an hour. If it's your own evening, price it as if you'd paid someone.
Materials in a hurry. Overnight shipping on blanks. A trip to a retail store for butter you'd normally buy by the case.
The job you pushed. If hurrying this order makes another one late, that customer's goodwill is part of the cost. It's hard to put a number on, which is why the rate exists.
Four orders
| Order | Price | Usual days | Days given | Rate | Fee by rate | Your extra cost | Rush fee |
|---|---|---|---|---|---|---|---|
| 24 polos with a logo | $672.00 | 10 | 3 | 30% | $201.60 | $78.00 | $201.60 |
| Custom cake, 40 servings | $180.00 | 14 | 2 | 50% | $90.00 | $45.00 | $90.00 |
| 50 engraved tumblers | $900.00 | 10 | 6 | 15% | $135.00 | $0.00 | $135.00 |
| Banner, 3 × 6 ft | $140.00 | 5 | 5 | None | $0.00 | $0.00 | $0.00 |
The polos need four hours of overtime at a $10 premium and $38 of overnight shipping on the blanks: $78 of extra cost. Three days of a ten-day lead time is under half and over a quarter, so the rate is 30%, or $201.60. The shop charges $201.60.
The tumblers cost nothing extra: the blanks are on the shelf and there's a gap in the week. The fee is still $135. A rush fee isn't only cost recovery. It's the price of jumping the line.
Watch small orders. On a $40 order, 30% is $12, and two hours of overtime costs more than that. The cost check catches it, and a minimum rush fee, say $25, says it up front.
When to say no
- The materials can't get here in time at any price.
- It would make an order you've already promised late.
- The work can't be done well in the time: a cake that needs a day to set, embroidery on a proof nobody has approved.
A rushed order that goes wrong costs more than the fee earned. "I can't do Friday, I can do Tuesday" loses fewer customers than a late or bad order does.
How to say it
Put it in writing before the first rush request, on the order form and the website: the usual lead time, the rates, and that the fee is due with the deposit. Then quote it as its own line:
| Line | Amount |
|---|---|
| 24 polos with left-chest logo, at $28 | $672.00 |
| Digitizing | $40.00 |
| Rush: 3 working days in place of 10 | $201.60 |
| Total before tax | $913.60 |
A separate line tells the customer what ordering earlier would have saved. Folded into the price, it just looks like you're expensive. An order form with a line for it is in custom order form template, and pricing the work itself in how to price embroidery and how to price cakes.
Get the calculator
Download the rush fee calculator. One sheet and a read-me: type the order's price, your usual lead time, the days given, and what the rush costs you. It picks the rate, works out both sums and shows the larger. The rates are in one formula you can change. It's an ordinary Excel file with no macros, and it works in Google Sheets, LibreOffice and Numbers.
Where this stops working
The fee is the easy question. The hard one comes first: can you do it at all? Are there 24 navy polos in the right sizes on the rack, or enough butter for a cake on Thursday? What else is due that week? The answer is usually a walk to the shelf and a look at a wall calendar, with the customer waiting on the phone.
How TaroStack does it
TaroStack answers "can we?" before you quote.
"What could I make right now" says how many the stock on hand allows, and which material runs out first.
Each supplier has a lead time, so you know whether the blanks can arrive before Thursday.
Customers and sales orders, each with the date it ships, and one picking list for the day.
A reorder list in days of cover, so the rush is rarely for something you ran out of.
| The job | Calendar and shelf | In TaroStack |
|---|---|---|
| Enough blanks for the rush | Go and count | What could I make right now |
| Can the supplier deliver in time | Call them | The supplier's lead time |
| What else is due that week | The wall calendar | Sales orders, by ship date |
| Running out next time | Hope | The reorder list |
TaroStack doesn't set your rush fee or schedule your overtime. Stock, recipes and sales orders are on every plan, from $9.99 a month (5 recipes) or $39 a month (50 recipes). The first 14 days are free, with no credit card. If you'd like a hand setting up, ask, and we'll do it with you.