Validation asks whether a preventive control can control the hazard: before the plan starts, or within 90 days of first production when that's needed, a preventive controls qualified individual gathers scientific evidence, or runs a study, showing that the control, done as written, works. Verification asks whether it is working, every day: calibrating the thermometers, testing product or the environment where that fits, and reviewing the records, monitoring and corrective action records within 7 working days. Validation is done once, and again when something changes; verification never stops. Allergen controls, sanitation controls, the recall plan and the supply-chain program don't need validating, but they do need verifying. In the example below, a Colorado granola maker validates its bake step and sets up its verification.

The short version

  • Validation: proof, before or soon after you start, that a control can work.
  • Verification: ongoing checks that it is working.
  • Validate within 90 days of first production when it can't be done before.
  • Revalidate when a change could affect the control.
  • Review monitoring and corrective action records within 7 working days.
  • Allergen, sanitation, recall and supply-chain controls aren't validated, but are verified.
  • TaroStack keeps every batch's record by lot. More below.

The difference

Validation Verification
The question Can this control work? Is it working, batch after batch?
When Before the plan starts, or within 90 days of first production; again after a change All the time, on a written schedule
How Scientific evidence, or a study Calibration, product or environmental testing, records review
Who A preventive controls qualified individual, or under one Staff, with records reviewed by or under a qualified individual
Which controls Process controls and others; not allergen, sanitation, recall or supply-chain All of them

The controls themselves come from the hazard analysis, in hazard analysis template, and environmental testing in environmental monitoring program template.

The rules

Rule Where
Validation By or under a preventive controls qualified individual; before implementing the plan or within 90 days of first production when needed; after changes; scientific evidence or studies (21 CFR 117.160)
Not validated Food allergen controls, sanitation controls, the recall plan and the supply-chain program (117.160(c))
Verification Calibration, product testing, environmental monitoring, records review, and other activities; written procedures (117.165)
Records review Monitoring and corrective action records within 7 working days; calibration, testing and supplier records within a reasonable time (117.165(a)(4))
Keeping records At least 2 years after they were prepared (117.315)

This is general information, not legal advice.

An example: the bake step

Summit Ridge Snacks, a made-up granola and snack bar maker in Boulder, Colorado, with about $2.4 million a year in sales to grocers in six states, bakes its granola as a process control for Salmonella in the oats and nuts. Its preventive controls qualified individual set up both sides:

Side What they did How often
Validation A lab study with a surrogate organism on the oven, at the slowest belt speed and coolest zone, showing the bake met its target reduction Once, and again when the oven or recipe changes
Monitoring Oven temperature and belt speed recorded by the operator Every hour
Verification: calibration Oven thermometers checked against a reference thermometer Each month
Verification: records review The qualified individual reviews the oven and corrective action records Within 7 working days
Verification: environmental monitoring Swabs in the cooling and bagging room Each week

When the bakery added a second oven, the change brought a new validation study before the oven's first production run. A deviation, a zone that ran 15 degrees cool for 20 minutes, went on a corrective action record, and the bags from that time were held, in hold and release procedure.

Get the checker

Download the verification tracker. One sheet: each record, the date it was made, the date it was reviewed, and its kind; the working days it took and whether it met the 7-day review fill in. It's an ordinary Excel file with no macros, and it works in Google Sheets, LibreOffice and Numbers.

Where this stops working

The tracker checks the review clock. The oven records only mean something if each one can be tied to the lots baked during it, and the bags those lots filled.

How TaroStack does it

TaroStack keeps every batch by lot and date, so a deviation on the oven log leads to the bags it touched.

Batches by lot and date. Each bake is a batch with its date, the ingredient lots it used and how many bags it made.

Holds by lot. A lot can be put on hold so it can't be sold until it's released.

Recalls. If a lot has to come back, one report shows every customer who got it.

The job Notebook In TaroStack
Bags baked during a deviation Matched by hand Batches by date
Keeping held bags off orders A sign on the pallet A hold on the lot
Who got a lot Invoices One recall report

Batches, lots, holds and recalls are on every plan, from $49 a month. The first 30 days are free, with no credit card. If you'd like a hand setting up, ask, and we'll do it with you.

Questions people also ask

What is the difference between validation and verification?

Validation shows a control can work, with scientific evidence or a study; verification checks, on a schedule, that it is working.

When must preventive controls be validated?

Before the food safety plan is implemented, or within 90 days of first production when needed, and again after a change that could affect them.

What are examples of verification activities?

Calibrating thermometers, product testing, environmental monitoring, and reviewing monitoring and corrective action records.

Do allergen controls need to be validated?

No: allergen controls, sanitation controls, the recall plan and the supply-chain program don't need validating, but they are verified.

Sources

  1. 21 CFR 117.160: preventive controls are validated by or under a preventive controls qualified individual, before the food safety plan is implemented or, when needed, within 90 calendar days after production begins, and again after changes; using scientific and technical evidence or studies; not required for allergen controls, sanitation controls, the recall plan or the supply-chain program · read October 19, 2026
  2. 21 CFR 117.165: verification that controls are consistently implemented and effective: calibration, product testing, environmental monitoring, and review of monitoring and corrective action records within 7 working days, and other records within a reasonable time; written procedures · read October 19, 2026
  3. 21 CFR 117.315: records kept at least 2 years after they were prepared · read October 19, 2026

We use AI to help with the research for these articles. Every one is read, checked against its sources and edited by Koa before it's published. Spot a mistake? Tell us and we'll fix it and say so. How we write these.

Let’s get your stack in order.

Get TaroStack

Sign up now for your free 30 day trial. No credit card required.