A production planner decides what gets made, when, and in what order, and makes sure the materials, people and equipment are there when each batch starts. In a small company that isn't usually a job title. It's an hour of the owner's Sunday evening, done from memory. It becomes a role when the memory stops being enough: more products, more customers with dates, more ways for a week to go wrong. The planner sits between sales, who promise, purchasing, who buy, and the floor, who make, and is the one person looking at all three at once. Below are the six responsibilities, a week of the work task by task, the numbers the job is judged on, and a checklist to change to your own. The example is a made-up sauce maker's routine.
The short version
- The planner owns the schedule: what, when, in what order.
- Six responsibilities: demand, stock, materials, capacity, sequence, communication.
- Most of the week is checking, before the schedule is published.
- A materials check for every batch prevents the most common late start.
- The job is judged on what was made as planned and what shipped on time.
- When something breaks, the planner decides what moves and tells everyone.
- TaroStack names what will run short before the week starts. More below.
Six responsibilities
| Responsibility | The question | What the planner looks at |
|---|---|---|
| Demand | What has to ship, and when? | Open orders, standing orders, what usually sells |
| Stock | What's already made? | Finished goods on hand, by date |
| Materials | Is there enough to make it? | Recipes, stock, open purchase orders, lead times |
| Capacity | Does it fit the week? | Batch times, people, equipment, cleaning, maintenance |
| Sequence | In what order? | Changeovers, allergens, what's due first |
| Communication | Who needs to know? | The floor, purchasing, sales, the warehouse |
Demand, less stock, is what to make. The planner adds a cushion for products that sell unevenly, and makes to order the ones that don't keep.
Materials are checked for every batch, not for the week as a whole. Jars for Tuesday's batch that arrive on Thursday were "on order" all week.
Capacity is hours. A kettle that does three batches a day does fifteen in a week, less the cleaning and less the morning it's booked for maintenance.
Sequence saves hours. Running mild before hot, and the product with an allergen last before the full clean, means fewer washdowns. The rules for that belong to whoever owns food safety. The planner follows them.
A planner's week
| Day | Task | What it answers | Goes to |
|---|---|---|---|
| Monday | Set last week's plan against what was made | What was missed, and why | Production manager |
| Monday | Read the open orders and standing orders | What has to ship, and when | |
| Tuesday | Check finished goods on hand, by date | What is already made | |
| Tuesday | Work out what to make | Orders, less stock, plus a cushion | |
| Tuesday | Check materials for every batch | What will run short, and when | Purchasing |
| Wednesday | Check hours, people and equipment | Whether the week fits | Production manager |
| Wednesday | Put the batches in order | Fewest changeovers; allergens last | |
| Thursday | Publish next week's schedule | Who makes what, on which day | The floor, the warehouse |
| Thursday | Place or chase purchase orders | Materials here before each batch | Suppliers |
| Every day | Walk the floor at the start of the shift | What changed overnight | |
| Every day | Change the plan when something breaks | What moves, and who is told | Sales, the floor |
| Friday | Confirm what shipped and what is late | Which customers to call | Sales |
The schedule goes out on Thursday for the week after, so that purchasing has two working days to fix what Tuesday's check found. This is one company's rhythm. A bakery plans by the day, not the week: see bakery production planning.
The work on paper: the week's plan is a master production schedule template or a production schedule example. The materials check is in material requirements planning example. Monday's review is a production plan vs actual sheet.
What the planner doesn't own
- Buying. The planner says what's needed and by when. Purchasing chooses the supplier and the price.
- Running the floor. The production manager decides who works where, and how a batch is made.
- Releasing product. Whether a batch is fit to ship is a quality decision.
- Promising dates. Sales promise. But sales should ask the planner first, and the planner should answer the same day.
In a company of twelve, two or three of these are the same person. Writing down which hat is being worn still helps: "I'm ordering jars" and "I've decided we need jars by Tuesday" are different decisions.
What the job is judged on
| Number | What it shows |
|---|---|
| Schedule attainment | How much of the plan was made as planned |
| Orders shipped on time and in full | Whether the plan was the right plan |
| Finished goods that ran out | Where the cushion was too thin |
| Stock written off past its date | Where too much was made |
| Batches that started late for want of materials | Whether the materials check worked |
| Overtime hours | Whether the week really fitted |
They pull against each other, and that's the job. Making more of everything stops the stockouts and fills the write-off bin.
Handing the job over
What an owner who has planned from memory knows, and should write down before handing over:
- The batch size for each product, and why it's that size.
- Which products can follow which without a full clean.
- Each supplier's real lead time, not the one on the price list.
- Which customers can take a day's delay and which can't.
- What usually goes wrong in which season.
That list, more than any schedule, is what the new planner needs in the first week.
Get the checklist
Download the planner's week checklist. One sheet and a read-me: the twelve tasks by day, what each answers, what it needs and who it goes to, with a column to tick. Change the days and tasks to your own. It's an ordinary Excel file with no macros, and it works in Google Sheets, LibreOffice and Numbers.
Where this stops working
Every task on the list is a lookup. Tuesday's material check, done by hand, means opening each recipe, multiplying by the batches planned, subtracting what's on the shelf and reading the purchase orders for dates. For twelve batches and forty ingredients that's most of a day, which is why it gets done for the big items and skipped for the labels. Labels are what stop a line.
How TaroStack does it
TaroStack does the lookups, so the planner's time goes on the decisions.
Planning, on Growth, says what to make, what to buy and what to move, and when, in plain words. Every suggestion is a draft you approve.
It names the exceptions: what will run short, arrive too late, or expire before it's used.
Work centers and capacity, so a week's plan doesn't promise more hours than you have.
Lead times checked against reality: what a supplier promises against how long deliveries really take.
"What could I make right now" says which batches the materials on hand will cover.
| The task | By hand | In TaroStack |
|---|---|---|
| Check materials for every batch | Most of a day | What will run short, named |
| Does the week fit | Add up the batch hours | Work centers and capacity |
| A supplier's real lead time | Memory | Promised against actual |
| What's in work now | Ask the floor | The batches that are started |
TaroStack doesn't assign people to shifts, and it doesn't decide which customer waits: that's still the planner. Recipes, batches and lots are on every plan, from $9.99 a month (5 recipes) or $39 a month (50 recipes, with planning). The first 14 days are free, with no credit card. If you'd like a hand setting up, ask, and we'll do it with you.