Skip to content

Deviation Report Template for Small Batch Makers (Free)

A free deviation report template: what the batch record says and what happened, planned or unplanned, minor to critical, the disposition, and a log.

By Koa Sterling. Product specialist at TaroStack and small business owner. Yes, I am a real human, and I actually sit in front of a computer and write these articles. Reviewed October 15, 2026 · 7 min read

A deviation report records the moment a batch went differently from its batch record: the step, what the record says, what happened instead, and what that means for the product. A mixing temperature missed, an ingredient from a different supplier, a step signed the next morning. The report says whether it was planned or unplanned, how serious it is, what was done with the batch, why it happened, and whether the batch is released, reworked or scrapped, and by whom. In the example below, a lotion maker adds the preservative 7 °C too hot, holds 96 bottles, sends a sample to a lab, and releases them a week later with a fix to the batch record. Below is what goes in a deviation report, how to class one, a filled-in example, a month's log, and a free template.

The short version

  • A deviation is any departure from the batch record, found during or after the batch.
  • Planned deviations are approved before the batch; unplanned ones are found during it.
  • Class each one: minor, major or critical, by what it could do to the product.
  • Hold the batch while a major or critical deviation is assessed.
  • Record the effect on the product, the cause, the disposition and who approved it.
  • If it could happen again, open a corrective action.
  • TaroStack holds a batch apart from what's for sale and keeps its readings, limits and notes on the batch record. More below.

What goes in a deviation report

Part What it records
Number and date DV-2026-014, the day it was found
Product, lot and batch size Which batch, and how much of it
Step Where in the batch record it happened
What the record says The instruction or limit
What happened What was done instead, with the reading
Planned or unplanned Approved in advance, or found during the batch
Class Minor, major or critical
Right away What was done with the batch
Effect on the product The assessment, and any tests with their results
Cause Why it happened
Disposition Release, rework, downgrade or scrap
Corrective action Whether one is needed, and its number
Approved and closed Who decided, and when

Minor, major or critical

Class Means Then
Minor No possible effect on quality or safety Recorded, batch released
Major Could affect quality Batch held, assessed and tested before release
Critical Could affect safety, or the product is out of specification Batch held; rework or scrap

The class is set by what could go wrong, not by what did: a preservative added too hot is major even if the lotion looks perfect, because the problem it could cause can't be seen. A product that fails its specification is a nonconforming product as well, handled the way nonconforming product form describes.

Planned and unplanned

A planned deviation is a change approved before the batch starts: a second supplier's beeswax because the usual one is out, a smaller batch for a trial. It's written up first, approved, and the batch record notes it. An unplanned deviation is found during or after the batch, and the report is written then. Both go in the same log, so a planned deviation that happens every month shows it's time to change the master record. How the master record and each batch record relate is in master batch record vs batch record.

A filled-in example: a lotion batch

Salt Marsh Soap Co., a made-up soap and lotion maker in Charleston, South Carolina, I use in these examples, makes a 24 kg batch of body lotion, 96 bottles:

Part Salt Marsh Soap Co.'s report
Number DV-2026-014, October 8
Product and lot Body lotion, 8 oz bottles, lot LO-261008A, 96 bottles
Step Step 7, cool-down: add the preservative
What the record says Add the preservative at 45 °C or below; the preservative's data sheet says below 50 °C
What happened Added at 52 °C; the thermometer was read at the top of the kettle while it was still cooling
Planned or unplanned Unplanned
Class Major: the preservative may work less well, which can't be seen in the lotion
Right away All 96 bottles put on hold and tagged; none had shipped
Effect on the product pH 5.6 (limit 5.0 to 6.0) and viscosity in range at 24 hours; lab microbial count within the lab's limits
Cause No hold point at the cool-down step; the thermometer read at the surface
Disposition Release, approved by the owner on October 15
Corrective action CA-2026-009: a temperature sign-off before the preservative, read at the center of the kettle

The batch was saved by a lab test that cost less than the batch; the corrective action is what keeps the next one from needing it. How a hold is placed and released is in hold and release procedure, and the batch record itself in cosmetic batch record template.

A month's log

Number Product and lot Class What happened Disposition Days open
DV-2026-011 Bar soap, SB-260909A Minor Batch record signed the next morning Release 0
DV-2026-012 Lip balm, LB-260918A Minor Beeswax from a second supplier, planned Release 0
DV-2026-013 Bath soak, BS-260930A Major Fragrance weighed at 2.4% against 2.0% Rework 2
DV-2026-014 Body lotion, LO-261008A Major Preservative added at 52 °C Release 7
DV-2026-015 Body lotion, LO-261013A Critical Emulsion separated at the 24-hour check Scrap 1

Two lotion deviations in one week, one of them a lost batch, say the lotion's batch record needs more attention than the soap's. The bath soak was reworked by blending in unscented soak, a fifth of the batch's weight, which brings 2.4% back down to 2.0%.

Get the template

Download the deviation report template. Three sheets: a blank deviation report to print or fill in; the lotion example, filled in; and a log with days open and status filling in, and counts of minor, major, critical, planned and still-open deviations at the side. It's an ordinary Excel file with no macros, and it works in Google Sheets, LibreOffice and Numbers.

Where this stops working

The report is a separate sheet from the batch record, the hold is a paper tag on a shelf, and the lab result is a PDF in an email. When a shop asks about lot LO-261008A six months later, the answer is in three places. And a hold tag doesn't stop someone packing an order from the shelf.

How TaroStack does it

TaroStack holds a batch apart from what's for sale and keeps its readings, limits and notes on the batch record.

Readings with their limits. A printable batch record form carries your own fields, such as the temperature at the cool-down step, the pH and the viscosity, with their limits and a sign-off, and a text field for what went differently, so the deviation is written on the batch it happened to.

A hold that holds. A held batch is kept apart from what's available to sell, so it doesn't reach a picking list until it's released. A scrapped batch leaves stock with its reason, recorded with who, when and why.

Good and rejected. Each batch records how many units came out good and how many were rejected, and the lots it used, so a deviation's cost and the ingredients involved are on the record.

The job Paper In TaroStack
The reading that went out of range Written on the sheet On the batch record, against its limit
Keeping the batch from sale A tag on the shelf Held, kept from sale
What a scrapped batch cost Worked out later Rejected units and a reason
Lot LO-261008A six months later Three folders One batch, with its fields and lots

Batch records, holds and adjustments are on every plan, from $49 a month. The first 30 days are free, with no credit card. If you'd like a hand setting up, ask, and we'll do it with you.

Questions people also ask

What is a deviation report?

A record of a batch departing from its batch record: what the record says, what happened, its class, what was done with the batch, the cause, the disposition, and who approved it.

What's the difference between a planned and an unplanned deviation?

A planned deviation is approved before the batch, such as an ingredient from a second supplier; an unplanned one is found during or after the batch.

How are deviations classified?

Minor, with no possible effect on quality or safety; major, which could affect quality and needs an assessment; and critical, which could affect safety or means the product is out of specification.

What's the difference between a deviation and a nonconformance?

A deviation is a departure from the process; a nonconformance is product that fails its specification. A deviation can cause a nonconformance, and a critical one often does.

We use AI to help with the research for these articles. Every one is read, checked against its sources and edited by Koa before it's published. Spot a mistake? Tell us and we'll fix it and say so. How we write these.

Let’s get your stack in order.

Get TaroStack

Sign up now for your free 30 day trial. No credit card required.